Light Weight Steel Buildings

Saify Iron keeping up with international building trends have penetrated into the market of Light steel building structures. A structure which takes 10 months to be build in conventional RCC construction can be build in less than 2 months with light gauge steel solution. This has numerous benefits such as time saving, less labor and faster and easier construction using GREEN materials. We provide these structures in following markets:

  • Residential
  • Commercial
  • Floor Extension
  • Farm Houses
  • Beach Huts
  • Portable Cabins
  • Labour Units

SALIENT FEATURES

  • Faster construction time
  • Minimum labour
  • Earthquake resistant, hence minimum destruction
  • Pre fabricated, modular
  • Quick and easy to modify
  • Better Standard material (fireproof, smooth finishing)
  • Not vulnerable to termites, insects etc.
  • Structure has salvage value
  • More innovative designs can be achieved
  • Clean Construction/Green construction

 

?
Structure of Light Gauge Steel House Fabrication of Light Gauge Steel House

Finished Light Gauge Steel House

Translate

English Arabic Chinese (Simplified) Dutch French German Greek Italian Russian Spanish

Weight Calculator